Taxiway B East and Associated Improvements

Orlando Sanford International Airport

Sanford, FL

Owner: Sanford Airport Authority

 

This project consisted of the extension of Taxiway B East and Associated Improvements.  AVCON provided engineering and design services for approximately 40,000 square yards of flexible subbase and base course construction, 17,700 tons of P-401 bituminous pavement, airfield lighting, signs, REILs, and miscellaneous drainage items.

 

In the former configuration, various aircraft that required the full runway length were required to back-taxi and perform a U-turn on the runway prior to takeoff. The extension of Taxiway B and associated connectors greatly improved traffic circulation, provided increased airfield capacity, and reduced runway dwell time.

 

AVCON's professional services included surveying and geotechnical investigation, wetlands mitigation, T&E species surveys and mitigation, drainage design and permitting, regulatory and funding agency coordination, airfield design, airfield lighting and signage design, bidding services and complete construction phase services.

 

<<Back

 

 

AVCON, INC. 2004©, All rights reserved _____________________________________________________________________
homepage :: sitemap :: contact us :: current projects :: current events :: employment :: construction